Electrical Design
Stamped construction documents for power, distribution, and life-safety systems — from feasibility through permit and IFC sets.
A licensed C-10 contractor delivering electrical construction, design-build, and 24/7 service across high-rise, hospitality, healthcare, and EV infrastructure projects.
We sit on the design side of the table — engineering, modeling, and preconstruction — so the electrical scope is solved before steel goes up. Fewer RFIs, cleaner sets, an estimate the GC can stand on.
Stamped construction documents for power, distribution, and life-safety systems — from feasibility through permit and IFC sets.
Photometric layouts, fixture specification, and Title 24 compliance — engineered for the architecture and the rebate at the same time.
Constructability review, value engineering, conceptual estimates, and long-lead procurement — locked in before the schedule does.
Revit-native MEP coordination, clash detection, and prefab-ready models — LOD 350 to 400 depending on phase.
Built deliberately to be the contractor that doesn't slip the schedule, doesn't pad the change orders, and doesn't lose the safety paperwork.
California C-10 #1234567, fully bonded, and signatory to IBEW Local 11. Audited annually.
Weekly toolbox talks, OSHA 30 across the field, and an EMR third year under industry average.
94% of projects delivered on or ahead of substantial completion — published quarterly.
Engineering, prefab, install, and service under one roof — no handoff penalties.
A sample from the last 24 months. Each project was self-performed from medium-voltage feeders through finish-trim.
Safety at DynamoElectric is run like a department, not a slogan. We publish our incident logs to every owner who asks, and we rotate field personnel through certification on a recurring cadence — not "as needed."
47 open roles across Greater LA, Orange County, and the Inland Empire. Health, pension, IBEW wage scale, and a tools-down clock we actually honor.
DynamoElectric pulled their MEP scope across the finish line two weeks ahead of substantial. Their PM ran our weekly OAC like he owned the schedule.
We've turned six tenant fit-outs with their TI division. They show up on day one with a punch-ready plan and they don't chase changes through RFIs.
Their service desk picked up on Christmas Eve when our chiller plant dropped a feeder. Tech on-site in 38 minutes. That's the bar now.
Send us the plans, the RFI log, and a target schedule. A real human from estimating responds within one business day.
Send plans + schedule. We respond within one business day.
bids@dynamoelectric.comEstimating desk staffed Mon–Fri, 6:30 AM – 6 PM PT.
Call nowPower, lighting, panel faults — < 4 hr response across LA.
Open a ticketWCAG2.1-AA Compliant