Starting from $2,5002–6 weeksElectrical Design
Code-compliant single-line diagrams, load calculations, panel schedules, and grounding studies for commercial and industrial projects.
Four design-side practices that turn early-stage drawings into biddable, buildable electrical scope. Fixed-fee engagements, published lead times, no contractor markup baked in.
Each card lists the deliverable, the starting fee, and the typical delivery window. Click through for the full scope and a fixed-fee quote request.
Starting from $2,5002–6 weeksCode-compliant single-line diagrams, load calculations, panel schedules, and grounding studies for commercial and industrial projects.
Starting from $1,8001–4 weeksPhotometric modeling, fixture selection, and lighting controls programming for offices, warehouses, retail, and outdoor sites.
Starting from $3,5003–12 weeksRevit/Navisworks coordination: clash detection, 3D coordination sequences, and as-built handoff models for facilities ops.
Starting from $1,2001–8 weeksOwner-side advisory during design development: constructability review, value engineering, schedule risk, and bid scoping.
No services published yet.
Add a Service record in the CMS to see it appear here.
We publish our process the same way we publish our fees — so the owner, the GC, and the AHJ all know what comes next.
We review drawings, target schedule, and AHJ. Free, no commitment.
Deliverables, milestones, and a not-to-exceed number — in writing, within 48 hrs.
Drawings and review process. Collaboration with team members.
Yes. All construction-document sets are stamped by a California- licensed PE on staff. Permit revisions included for 90 days after IFC.
Always. We work direct-to-owner and as a subconsultant to AOR firms. We share Revit central files and BIM 360 / ACC workspaces seamlessly.
Revit 2022–2025 for BIM, AutoCAD for 2D, AGi32 for photometrics, SKM PowerTools for coordination & arc-flash studies. We hand off PDF + native + a clean BIM 360 link.
Schematic and DD-level rough orders of magnitude are included on every project. CD-level GMP estimates are a separate engagement (see Pre-Construction Consultation).
Drop your floor plans, target schedule, and AHJ. We respond with a fixed-fee scope of work within one business day.
WCAG2.1-AA Compliant